The Brief
These storms pose a threat to the safety of line handling personnel in situations where the work cannot be postponed, e.g., because a fully laden vessel would undergo structural damage.
The Outcome
A lightning study was undertaken to quantify the risk to personnel and ways to mitigate the risks. Practical recommendations flowed from the study, including procedural, PPE and lightning shelter actions.